053-335666 adm.cm.ppsn@gmail.com
PPSN Co., Ltd.,

Projects

Our growth has been built on experience, expertise, and the trust of our clients.

200+
โครงการที่แล้วเสร็จ
35+
ปีประสบการณ์
100+
ลูกค้าที่ไว้วางใจ
11
ประเภทโครงการ

Type Convention

1 Project
Convention Completed
Chiang Mai International Convention and Exhibition Centre
Ministry of Tourism and Sports
Mueang Chiang Mai District, Chiang Mai
June 2010 – March 2012
THB 1,867 Million
550,490 sq.m.

Type Education

2 Project
Education Completed
Singapore International School of Bangkok (SISB Chiang Mai)
SISB Siri Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
January - December 2016
THB 112.50 Million
3-Storey Building: 7,933 sq.m. Parking Area (24 Spaces): 1,439 sq.m.
Education Completed
21st Century Teaching and Learning Building, Thammasat University Demonstration School, including Building Equipment, Thammasat University, Rangsit Campus
Thammasat University
Khlong Luang District, Pathum Thani, Thailand
May 2019 – November 2021
THB 421 Million
19,296 sq.m.

Type Healthcare

8 Project
Healthcare Completed
Medical Education Building (84th Birthday Anniversary Building), Naresuan University
Naresuan University
Mueang Phitsanulok District, Phitsanulok
March 2010 – February 2012
THB 834 Million
63,302 sq.m.
Healthcare Completed
Bangkok Hospital Chiang Mai
Bangkok Hospital Chiang Mai Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
1 August 2012 – 31 December 2014
THB 910 Million
25,000 sq.m. (Phase 1)
Healthcare Completed
Bangkok Chinatown Hospital Building
Bangkok Dusit Medical Services Public Company Limited
Samphanthawong District, Bangkok
May 2013 – February 2014
THB 450 Million
12,113 sq.m.
Healthcare Completed
Renovation of OPD Level 2, GI Center Level 4 and IPD Level 9, Bangkok Hospital Chiang Mai
Bangkok Hospital Chiang Mai Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
April 2016 – August 2016
THB 39 Million
OPD Level 2: 1,000 sq.m. IPD Level 9: 1,040 sq.m.
Healthcare Completed
Medical Excellence Center, Suranaree University of Technology
Suranaree University of Technology
Mueang Nakhon Ratchasima District, Nakhon Ratchasima
August 2014 – February 2019
THB 1,800 Million
81,179 sq.m.
Healthcare Completed
Bangkok Hospital Chiang Rai
Bangkok Hospital Chiang Rai Co., Ltd.
Nang Lae, Mueang Chiang Rai District, Chiang Rai
August 2016 – 31 August 2018
THB 558 Million
27,605 sq.m.
Healthcare Completed
Lamphun Klaimor Hospital
Lamphun Klaimor Co., Ltd.
Mueang Lamphun District, Lamphun, Thailand
1 August 2018 – 30 September 2020 (Contract Extension)
THB 615 Million
16,000 sq.m. Checkup Building: 5-storey reinforced concrete building with 1 basement level Hospital Building: 7-storey reinforced concrete building with 1 basement level
Healthcare Completed
Thammasat Anatomy and Clinical Training Center
Faculty of Medicine, Thammasat University, Rangsit Campus
Khlong Luang District, Pathum Thani, Thailand
October 2020 – November 2022
THB 388.41 Million
29,712 sq.m.

Type Hospitality

12 Project
Hospitality Completed
RARINJINDA WELLNESS CENTER & RESIDENCE
Rarinjinda Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
August 2005 – December 2006
THB 188 Million
10,390 sq.m.
Hospitality Completed
Engineering Survey and Design for Dusit Thani Pattaya
Dusit Thani Hotel
Pattaya
THB 150 Million
Hospitality Completed
Survey, Design, Project Management and Construction Supervision for Dusit Thani Bangkok Renovation
Dusit Thani Hotel
Bangkok
2009 – 2010
THB 100 Million
Hospitality Completed
Project Management and Construction Supervision for Royal Princess Chiang Mai Renovation
Dusit Thani Hotel
Chiang Mai
2008 – 2010
THB 50 Million
Hospitality Completed
Survey and Design for Dusit Princess Srinakarin Bangkok
Dusit Thani Hotel
Bangkok
THB 10 Million
Hospitality Completed
U Chiang Mai Hotel
BTS Group Holdings Public Company Limited
Mueang Chiang Mai District, Chiang Mai
September 2007 – May 2008
THB 81 Million
2,600 sq.m.
Hospitality Completed
Rapee Hotel
Chiangmai Pornrawee Limited Partnership
Mueang Chiang Mai District, Chiang Mai
October 2015 – November 2017
THB 300 Million
10,465 sq.m.
Hospitality Completed
Syn Art Hotel
Chiang Mai Phu Kham (3) Co., Ltd.
Mueang Chiang Mai District, Chiang Mai, Thailand
July 2018 – July 2019
THB 170 Million
6,100 sq.m.
Hospitality Completed
Ban Thanasin Hotel
Thanasin 2560 Co., Ltd.
San Kamphaeng District, Chiang Mai, Thailand
January 2019 – March 2021
THB 200 Million
2,000 sq.m.
Hospitality Completed
dusitD2 Hua Hin Hotel
Enrich Pranimmit Co., Ltd.
Hua Hin District, Prachuap Khiri Khan
July 2019 – April 2021
THB 620 Million
10,000 sq.m.
Hospitality Completed
Boutique Chiang Mai Nimman Two
Boutique Chiang Mai Nimman Two Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
Piling Works: 26 October 2020 – 16 December 2020 (51 days) Structural, Architectural, and MEP Works: 15 January 2021 – 31 October 2022
THB 3.82 Million
6,600 sq.m.
Hospitality Completed
Sathorn Project One Hotel
Sathorn Project One Co., Ltd.
Bang Rak District, Bangkok
May 2020 – June 2023
THB 1,040 Million
3 ngan 50 square wah

Type Industrial

4 Project
Industrial Completed
Office Building and Factory for Georg Jensen (Thailand) Co., Ltd.
Georg Jensen (Thailand) Co., Ltd.
San Kamphaeng District, Chiang Mai
April 2003 – December 2003
THB 55 Million
4,320 sq.m.
Industrial Completed
Wansut Sweet Manufacturing Co., Ltd. (Khanom Baan Ajarn)
Wansut Sweet Manufacturing Co., Ltd.
Mueang Lamphun District, Lamphun
December 2007 – October 2008
THB 31 Million
3,730 sq.m.
Industrial Completed
Office Building and Factory for Onsmooth Thai Co., Ltd.
Onsmooth Thai Co., Ltd.
Saraphi District, Chiang Mai
June 2002 – November 2002
THB 26 Million
8,500 sq.m.
Industrial Completed
Wong Ek Flexible Pack Co., Ltd. Factory
Wong Ek Flexible Pack Co., Ltd.
Nong Chok Subdistrict, Bang Pakong District, Chachoengsao, Thailand
1 June 2025 – 31 May 2026

Type Infrastructure

5 Project
Infrastructure Completed
Study, Survey and Design Project for the Rehabilitation and Improvement of Runway, Taxiway and Apron Pavements at Don Mueang International Airport
Airports of Thailand Public Company Limited (AOT)
Don Mueang District, Bangkok
July - September 2012
THB 432 Million
2,500,000 sq.m.
Infrastructure Completed
MRT Blue Line Extension Project (Hua Lamphong–Bang Khae and Bang Sue–Tha Phra Sections)
Mass Rapid Transit Authority of Thailand (MRTA)
Bangkok
April 2011 – July 2016
THB 74,000 Million
27 KM.
Infrastructure Completed
Project Management and Construction Supervision Consultant 1 (PMCSC 1), MRT Purple Line Project, Tao Poon–Rat Burana Section (Kanchanaphisek Ring Road)
Mass Rapid Transit Authority of Thailand (MRTA)
Bangkok, Thailand
1 June 2022 – 31 May 2030
THB 101,112 Million
23.6 km
Infrastructure Completed
Survey and Design Services for the Chiang Mai International Airport Development Project, Phase 1
Airports of Thailand Public Company Limited
Suthep Subdistrict, Mueang Chiang Mai District, Chiang Mai, Thailand
20 July 2023 – 29 March 2028
THB 10,860 Million
Infrastructure Completed
Detailed Design and Construction Supervision for Building Systems of the Thanyaburi Telephone Exchange (MSCTYB)
True Move H Universal Communication Co., Ltd.
Thanyaburi District, Pathum Thani, Thailand
1 November 2025 – 30 April 2026
THB 100 Million
6,500 sq.m.

Type Office Building

7 Project
Office Building Completed
Exhibition and Recreation Education Building Construction Supervision Project
Rajamangala University of Technology Krungthep
Sathon District, Bangkok
June 2015 – March 2018
THB 440 Million
25,375.8 sq.m.
Office Building Completed
CENTRAL WORLD TOWER
Central World Plaza Public Company Limited
Pathum Wan District, Bangkok
January 2005 – December 2006
THB 2,000 Million
60,000 sq.m.
Office Building Completed
Sports Administration Center Building (Sports Training and Competition Center)
Sports Authority of Thailand
Hua Mak, Bangkok
December 2008 – November 2011
THB 1,376 Million
57,500 sq.m.
Office Building Completed
SC Tower Office Building
SC Asset Corporation Public Company Limited
Phaya Thai District, Bangkok
February 2014 – July 2016
THB 900 Million
26,750 sq.m.
Office Building Completed
7-Storey Office Building for Sweety Nature Park Co., Ltd.
Sweety Nature Park Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
March 2008 – June 2009
THB 80 Million
4,000 sq.m.
Office Building Completed
CMU BIOPOLIS – Bioeconomic Innovation Building, Chiang Mai University
Food Innovation and Packaging Center, Chiang Mai University
Mueang Chiang Mai District, Chiang Mai, Thailand
10 May 2023 – 1 October 2024
THB 129.58 Million
11,000 sq.m., comprising a 4-storey building
Office Building Completed
OKMD National Knowledge Center (Ratchadamnoen Center 1 and 2)
Office of Knowledge Management and Development (Public Organization)
The Treasury Office, Ratchadamnoen Klang Road, Talat Yot Subdistrict, Phra Nakhon District, Bangkok, Thailand
5 September 2025 – 23 December 2027
THB 897 Million
NKC1: Approximately 16,000 sq.m. NKC2: Approximately 4,000 sq.m.

Type Residential

26 Project
Residential Completed
Sindhorn Residence
Siam Sindhorn Co., Ltd.
Lumphini, Bangkok
June 2013 – January 2017
THB 2,500 Million
52,000 sq.m.
Residential Completed
Sindhorn Midtown
Siam Sindhorn Co., Ltd.
Lumphini, Bangkok
December 2015 – March 2017
THB 1,800 Million
38,587 sq.m.
Residential Completed
IVY River Condominium
Pruksa Real Estate Public Co.,Ltd.
Sathon District, Bangkok
May 2008 – January 2010
THB 1,220 Million
89,800 sq.m.
Residential Completed
IVY Sathorn Condominium
Pruksa Real Estate Public Company Limited
Sathon District, Bangkok
May 2008 – December 2009
THB 500 Million
21,000 sq.m.
Residential Completed
IVY Ratchada Condominium
Pruksa Real Estate Public Company Limited
Huai Khwang District, Bangkok
November 2007 – December 2008
THB 260 Million
26,360 sq.m.
Residential Completed
ISSARA COLLECTION SATHORN
Charn Issara Viphavadi Co., Ltd.
Sathon District, Bangkok
May 2015 – June 2018
THB 290 Million
9,896 sq.m.
Residential Completed
NORTH PLACE (NORTH 1)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
November 2012 – September 2014
THB 85.83 Million
3,952 sq.m.
Residential Completed
LAKE POINT (NORTH 2)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
November 2012 – November 2014
THB 85.24 Million
3,952 sq.m.
Residential Completed
SERENE VILLE (NORTH 3)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
October 2012 – December 2014
THB 87.03 Million
3,952 sq.m.
Residential Completed
HILL GATE (NORTH 4)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
September 2013 – June 2015
THB 90.25 Million
3,952 sq.m.
Residential Completed
BLISS PARK (NORTH 5)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
September 2013 – June 2015
THB 89.85 Million
3,952 sq.m.
Residential Completed
VILLE MOUNT (NORTH 6)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
September 2015 – March 2016
THB 85.81 Million
3,952 sq.m.
Residential Completed
PLENARY HILL (NORTH 7)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
November 2013 – June 2016
THB 73.32 Million
3,952 sq.m.
Residential Completed
NORTH EIGHT (THE KEY CHIANG MAI)
Land and Houses Public Company Limited
Mueang Chiang Mai District, Chiang Mai
February 2012 – June 2015
THB 228.5 Million
13,500 sq.m.
Residential Completed
Student Dormitory, Rajamangala University of Technology Krungthep
Rajamangala University of Technology Krungthep
Sathon District, Bangkok
16 August 2014 – 15 August 2015
THB 139 Million
8,545 sq.m.
Residential Completed
Bridge Sathorn-Narathiwas Condominium
Prinsiri Public Company Limited
Yan Nawa District, Bangkok
November 2012 – October 2013
THB 121 Million
5,688 sq.m.
Residential Completed
Sukhumvit 38 Residence
Sukhumvit 38, Khlong Toei District, Bangkok
April 2007 – September 2009
THB 190 Million
13,202 sq.m.
Residential Completed
Saladaeng Residence
Saladaeng Soi 1, Rama IV Road, Bang Rak District, Bangkok
March 2008 – February 2013
THB 159 Million
3,300 sq.m.
Residential Completed
Tonson Park View
Siam Sindhorn Co., Ltd.
Lumphini, Bangkok
October 2015 – March 2018
THB 941 Million
15,737 sq.m.
Residential Completed
The Issara Chiang Mai Condominium (Buildings C & D)
Charn Issara Viphapol Co., Ltd.
San Sai District, Chiang Mai
January 2016 – December 2018
THB 321 Million
20,000 sq.m.
Residential Completed
8-Storey Residential Building for Pordee Pattana Co., Ltd.
Pordee Pattana Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
May 2016 – July 2017
THB 45 Million
4,000 sq.m.
Residential Completed
Escent Park Ville Chiang Mai
CPN Residence Co., Ltd.
Mueang Chiang Mai District, Chiang Mai, Thailand
August 2019 – February 2021 (Contract Extension)
THB 534.25 Million
28,000 sq.m.
Residential Completed
ASTRA SKY RIVER
North Home Co., Ltd.
Mueang Chiang Mai District, Chiang Mai, Thailand
October 2019 – September 2022 (Contract Extension)
THB 1,720 Million
43,418 sq.m., comprising a 17-storey high-rise building with a rooftop swimming pool
Residential Completed
Escent Hatyai
CPN Residence Co., Ltd.
Hat Yai District, Songkhla, Thailand
16 January 2021 – 15 July 2023
THB 767.23 Million
43,083 sq.m.
Residential Completed
Arise CharoenMueang
North Home Property Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
1 March 2023 – 31 August 2025
THB 681 Million
29,846 sq.m., comprising a 19-storey building with one basement level and a swimming pool on the 4th floor
Residential Completed
Arise Hill
North Home Co., Ltd.
Moo 6, San Sai Noi Subdistrict, San Sai District, Chiang Mai, Thailand
1 April 2025 – 31 August 2026
THB 533 Million
Building A: 8-storey reinforced concrete building with 187 rooms, featuring 9,195.65 sq.m. of usable area, with parking, vehicle turning area, and access for 37 cars covering 475.78 sq.m.; Building B: 8-storey reinforced concrete building with 181 rooms, featuring 8,994.49 sq.m. of usable area, with parking, vehicle turning area, and access for 46 cars covering 475.96 sq.m.; Public Building (Service Building): 3-storey reinforced concrete building with 619.60 sq.m. of usable area, with parking, vehicle turning area, and access for 27 cars covering 704.16 sq.m.

Type Retail

13 Project
Retail Completed
CentralWorld
Central World Co., Ltd.
Pathum Wan District, Bangkok
January 2005 – December 2007
THB 2,599 Million
158,346 SQ.M.
Retail Completed
Central Airport Plaza Chiang Mai
Central Pattana Chiang Mai Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
September 1996 – February 2004
THB 1,250 Million
132,000 sq.m.
Retail Completed
CentralFestival Chiang Mai
Central Department Store Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
May 2013 – January 2014
THB 200 Million
48,000 sq.m.
Retail Completed
Central City Bangna Renovation Project
Bangna Central Property Co., Ltd.
Bang Na District, Bangkok
May 2003 – December 2003
THB 104 Million
Retail Completed
Central Department Store Silom Complex Renovation Project
Central Department Store Co., Ltd.
Bang Rak District, Bangkok
December 2011 – July 2012
THB 48 Million
12,983 sq.m.
Retail Completed
Siam Square One Shopping Complex
Chulalongkorn University
Pathum Wan District, Bangkok
June 2011 – November 2013
THB 1,573 Million
74,543 sq.m.
Retail Completed
Big C Hang Dong, Chiang Mai
Big C Supercenter Public Company Limited
Mueang Chiang Mai District, Chiang Mai
August 2006 – November 2007
THB 612 Million
48,600 sq.m.
Retail Completed
Big C Lamphun
Big C Supercenter Public Company Limited
Mueang Lamphun District, Lamphun
June 2006 – May 2007
THB 341 Million
20,000 sq.m.
Retail Completed
Yong House Mini Mall and Modern Trade
Yong House Co., Ltd.
Tha Muang District, Kanchanaburi
February 2012 – November 2012
THB 250 Million
20,000 sq.m.
Retail Completed
BCM Plaza
Bangkok Hospital Chiang Mai Co., Ltd.
Mueang Chiang Mai District, Chiang Mai
March 2015 – December 2015
THB 13.5 Million
1,000 sq.m.
Retail Completed
Central Festival Chiangmai (Renovate 2020) – Interior Renovation and MEP Works for Kad Luang and Fashion Plus, LG Floor
Central Pattana Public Company Limited
Mueang Chiang Mai District, Chiang Mai, Thailand
17 August 2020 – 31 March 2021
THB 25.72 Million
Retail Completed
Cove Hill Charoenkrung Community Mall
Boutique Charoenkrung Co., Ltd.
Bang Kho Laem District, Bangkok, Thailand
1 December 2022 – 30 September 2024
THB 103 Million
2,100 sq.m., comprising a 3-storey building
Retail Completed
Future Convenience Store, Chiang Mai
CP Future City Development Corporation Co., Ltd.
Mueang Chiang Mai District, Chiang Mai, Thailand
1 October 2024 – 28 February 2025
THB 18.5 Million
2,900 sq.m., comprising a 2-storey reinforced concrete building

Type Specialized Project

8 Project
Specialized Project Completed
High-Efficiency Biogas System for Landfill Leachate Treatment
Energy Research and Development Institute, Chiang Mai University
Hot District, Chiang Mai
February 2008 – February 2009
THB 38 Million
Specialized Project Completed
Biogas System for Palm Oil Factory
Lam Soon (Thailand) Public Company Limited
Sikao District, Trang
March 2008 – August 2008
THB 13 Million
Specialized Project Completed
Flight Simulator Building 2
Bangkok Airways Public Company Limited
Bang Phli District, Samut Prakan
July 2011 – October 2011
THB 58 Million
1,400 sq.m.
Specialized Project Completed
Flight Simulator Building 3
Bangkok Airways Public Company Limited
Bang Phli District, Samut Prakan
June 2014 – October 2014
THB 58 Million
1,400 sq.m.
Specialized Project Completed
NEW MSC-KKN Mobile Switching Center Building
BFKT (Thailand) Co., Ltd.
Mueang Khon Kaen District, Khon Kaen
October 2012 – January 2013
THB 300 Million
5,700 sq.m.
Specialized Project Completed
Telecommunication Exchange Buildings (AGN, B2B, AN) and Data Center for True Corporation Group
Asia Wireless Communication Co., Ltd.
Bangkok Metropolitan Region
May 2015 – December 2016
THB 1,200 Million
AGN Buildings (11 Buildings): Approx. 286 sq.m. per building AN Buildings (113 Buildings): Approx. 32 sq.m. per building AN B2B Buildings (11 Buildings): Approx. 120 sq.m. per building
Specialized Project Completed
NEW MSC TYB Telecommunication Exchange Building and Data Center for True Corporation Group
True Move H Universal Communication Co., Ltd.
Thanyaburi District, Pathum Thani
May 2016 – April 2017
THB 550 Million
9,800 sq.m.
Specialized Project Completed
Flight Simulator Building 4
Bangkok Airways Public Company Limited
Bang Phli District, Samut Prakan, Thailand
November 2015 – May 2016
THB 58 Million
1,400 sq.m.
Our Clients

Organizations That Trust PPSN

Government Agencies and State Enterprises

Private Sector Organizations

Value Engineering Projects

In Progress
Value Engineering Services for Dusit Thani Hotel Group Projects

  • Value Engineering Services for Dusit Thani Hotel Group Projects

          1. Value Engineering Consulting Project for Dusit Thani Bangkok, 2017

          2. Value Engineering Consulting Project for Dusit Thani Pattaya, 2017

          3. Value Engineering Consulting Project for Dusit Princess Srinakarin Bangkok, 2017

          4. Value Engineering Consulting Project for Dusit Princess Korat, 2017

          5. Value Engineering Consulting Project for Dusit Princess Chiang Mai, 2017

          6. Value Engineering Consulting Project for Dusit Thani Laguna Phuket, 2017

          7. Value Engineering Consulting Project for Dusit Thani Hua Hin, 2017

          8. Value Engineering Consulting Project for Dusit D2 Chiang Mai, 2017

Completed
Construction Project for the Sports Organization Administration Center Building (Training and Competition Center) of the Sports Authority of Thailand

Originally, the total construction budget for the project was approximately THB 2 billion. However, since the Sports Authority of Thailand received a limited budget allocation of only THB 945 million, construction could proceed only for the Sports Organization Administration Center building. Several building system components necessary for complete functionality also had to be reduced or omitted.

The Sports Authority of Thailand appointed Sino-Thai Engineering and Construction Public Company Limited as the main contractor for the construction of the Sports Organization Administration Center building and appointed P.P.S.N. Co., Ltd. as the construction supervision consultant.

P.P.S.N. Co., Ltd. applied the principles of Value Engineering (VE) in managing the project. During the review of the foundation system construction drawings, it was found that, based on updated ministerial regulations and revised space utilization plans, the number of piles and foundation sizes could be reduced. This resulted in construction cost savings of approximately THB 24 million. The Sports Authority of Thailand then utilized these savings to complete other parts of the project that had previously been reduced or omitted, as well as to improve and modernize materials and equipment.

The implementation of Value Engineering (VE) principles in construction management carefully considered safety, structural stability, functionality, and architectural aesthetics while maintaining the project’s original objectives. The project also received excellent cooperation from the design team throughout the process.

The Governor of the Sports Authority of Thailand officially certified that P.P.S.N. Co., Ltd., as the engineering consultant and construction supervision consultant, successfully applied Value Engineering (VE) principles in managing the construction project of the Sports Organization Administration Center, resulting in significant benefits to the organization with highly satisfactory outcomes.



Work With Us

Have a project that requires professional consultation?

Our team of expert engineers is ready to provide consultation free of charge.